Bottom line
GRSAX vs IGF: the short answer
GRSAX (Brookfield Next Generation Infrastructure Fund) and IGF (iShares Global Infrastructure ETF) are both mutual funds.
IGF is cheaper at 0.37% vs 1.25% — a difference of $88 a year per $10,000 invested.
GRSAX has a front-end sales load of up to 4.75%; the other does not.
Updated Nov 19, 2026
GRSAX vs IGF side by side
| GRSAX | IGF | |
|---|---|---|
| Type | Mutual fund | ETF |
| Fund family | Brookfield | iShares |
| Category | Infrastructure | Infrastructure |
| Expense ratio | 1.25% | 0.37% |
| Annual cost per $10k | $125 | $37 |
| 10-yr cost on $10k (prospectus) | $2,818 | $468 |
| Max front load | 4.75% | None |
| 12b-1 fee | 0.25% | 0% |
| 1-yr return | — | +21.9% |
| 5-yr return (annualized) | — | +10.3% |
| 10-yr return (annualized) | — | +8.7% |
| Best quarter | +38.6% | +14.9% |
| Worst quarter | −15.2% | −29.3% |
| Net assets (fund) | — | $10.8B |
| Number of holdings | — | 93 |
| Portfolio turnover | 82% | 11% |
| Returns as of | — | Dec 31, 2025 |
Source: SEC Form N-PORT and fund prospectuses
Holdings overlap
GRSAX and IGF share none of their top holdings.
GRSAX top 10
IGF top 10
- Aena, S.M.E., S.A. — 5.10%
- Transurban Group — 5.02%
- Nextera Energy, Inc. — 4.79%
- Iberdrola, S.A. — 4.15%
- Enbridge Inc. — 3.97%
- Grupo Aeroportuario del Pacifico, S.A.B. de C.V. — 3.89%
- The Williams Companies, Inc. — 3.05%
- Auckland International Airport Limited — 3.03%
- The Southern Company — 2.83%
- Duke Energy Corporation — 2.64%
FAQ
What is the difference between GRSAX and IGF?
GRSAX (Brookfield Next Generation Infrastructure Fund) and IGF (iShares Global Infrastructure ETF) are both mutual funds. IGF is cheaper at 0.37% vs 1.25% — a difference of $88 a year per $10,000 invested.
Which is cheaper, GRSAX or IGF?
IGF has the lower expense ratio (0.37%).
Should I own both GRSAX and IGF?
Because their portfolios differ, owning both can add diversification — check how they fit your overall allocation.
Educational comparison based on public filings; not investment advice. Past performance does not guarantee future results.